Karya Tulis Ilmiah

Institut Teknologi Nasional - Bandung

A Scheduling Model for Production System Considering Material Handling Operations

ABSTRAK

In most techniques, production scheduling only consider production machines as resources. These techniques generally do not consider the material handling operations by assuming that the material handling equipments are always available and the handling time can be ignored. In systems with significant material handling time, ignoring the material handling operations may cause the material handling equipment allocation that does not fit the need for part transportation. In this study, a scheduling model considering material handling equipments as resource will be developed. The developed model will start from priority dispatching technique, by adding necessary steps to consider the material handling equipments.

Dibuat Oleh :

Rispianda
Jurusan Teknik Industri, Fakultas Teknologi Industri
Institut Teknologi Nasional
Jl. PKH. Mustapa. No.23, Bandung 40124
e-mail : rispianda@itenas.ac.id

Key Words   : sabut kelapa, mixing Ratio, tanah liat-gibsum-semen
Keterangan : Proceeding of Industrial Engineering and Service Science, 2011, September 20-21.
Keywords: Scheduling, Material Handling, Priority Dispatching Technique

 

A Scheduling Model for Production System Considering Material Handling Operations