Karya Tulis Ilmiah

Institut Teknologi Nasional - Bandung

A Scheduling Model for Production System Considering Material Handling Operations

ABSTRAK

 In most techniques, production scheduling only consider production machines as resources. These techniques generally do not consider the material handling operations by assuming that the material handling equipments are always available and the handling time can be ignored. In systems with significant material handling time, ignoring the material handling operations may cause the material handling equipment allocation that does not fit the need for part transportation. In this study, a scheduling model considering material handling equipments as resource will be developed. The developed model will start from priority dispatching technique, by adding necessary steps to consider the material handling equipments.

Dibuat Oleh : Dwi Kurniawan
Industrial Engineering Department, Institut Teknologi Nasional, Bandung, Indonesia
Jl. PKH. Mustapa. No.23, Bandung – 40124
e-mail :dwikur77@gmail.com

Keywords: Scheduling, Material Handling, Priority Dispatching Technique
Keterangan : Proceeding of Industrial Engineering and Service Science, 2011, September 20-21

A Scheduling Model for Production System Considering Material Handling Operations